Budget Quotation

Gyle Park Cage Resurface

Play Co
Small-sided football cage, Gyle Park · South Gyle, Edinburgh
Gyle Park Cage Resurface
Quotation · AIM/Q/2026-10/GYLE-PARK
Reference
AIM/Q/2026-10/GYLE-PARK
Issued
06/10/2026
Valid for
30 days
Programme
8 working days on site
Price
from £30,310 excl. VAT

Your three options

from £30,310
Lift the old surface and lay a new one · 630 m² · excluding VAT
Option A
Sand-filled, like for like
£30,310
excluding VAT

23 mm sand-filled football turf with kiln-dried sand infill. Hard-wearing, low upkeep, nothing for players to kick out of the cage.

Best for: an open, unsupervised public cage.

Our recommendation
Option B
3G football turf
£34,660
excluding VAT

40 mm 3G football turf with sand and rubber infill. Plays truer and softer underfoot. Needs regular brushing and infill top-ups.

Best for: a cage Play Co locks, books and looks after.

Option C
3G on a shockpad
£43,350
excluding VAT

Option B laid on a 10 mm shockpad. Better cushioning for players and a longer life for the carpet.

Best for: heavy coaching use where you want the best surface.

Price summary
OptionSurfacePrice, excluding VAT
ASand-filled, like for like
Lift, removal, base preparation, new 23 mm carpet, inlaid lines, sand infill
£30,310
B3G football turf
As A, with 40 mm 3G carpet and sand and rubber infill
£34,660
C3G on a shockpad
As B, laid on a 10 mm shockpad
£43,350
PSBase repairs, only if needed
Shown to you before any work, charged at cost plus 10%
£2,000

Each option is a fixed price for the work described, built from your photos and an aerial measurement of the cage. We confirm it after a short site visit. The existing base is re-used: if parts of it need repair once the old carpet is up, we show you before doing anything and charge at cost plus 10% against the provisional sum. Our recommendation is Option B if Play Co will lock and maintain the cage, and Option A if it stays open to the public.

What is and is not included

Included
  • Heras fencing round the cage and the load-out route, park signage and welfare for the crew
  • Ground protection over the park grass between the cage and our vehicles
  • Lifting the old carpet and its sand infill in strips, by machine
  • Removing the old surface from site to a licensed facility, with waste transfer notes and weighbridge tickets
  • Cleaning, jet-washing and treating the existing base for moss and algae, then a straightedge and level survey
  • Supply and laying of the new carpet in full-length drops, every joint taped and bonded
  • Inlaid white lines for a small-sided football layout
  • Edges trimmed tight to the timber kick boards and the goal recesses, fixed to the base
  • Infill spread and brushed in, in thin passes, for the option you choose
  • Clearing the site, reinstating any park grass we mark, and handing over with a care sheet
Excluded
  • Repair or replacement of the timber kick boards and posts. We inspect them once the carpet is up and price any work then
  • Base repairs. If parts of the base need repair once the old carpet is up, we show you first and charge at cost plus 10% against a provisional £2,000
  • Weldmesh fencing, gates, goals and floodlights, which stay as they are
  • Graffiti removal from the timber boards
  • Performance testing and certification of the finished surface
  • Ongoing brushing and infill top-ups after handover
  • Landowner consent, licences or any council fees
  • VAT, charged at the standard rate

How we do it, step by step

01

Set up and protect the park

Heras fencing, signage and ground protection go in along the path side of the cage, so the park stays open while we work.

The cage from the park path
The cage from the park path
02

Lift the old surface

The worn carpet and its sand come up in strips by machine and leave site to a licensed facility, with a waste transfer note for every load.

The worn sand-filled carpet that comes up
The worn sand-filled carpet that comes up
Moss, silt and compacted infill on the current surface
Moss, silt and compacted infill on the current surface
03

Prepare and check the base

The base is cleaned, treated and surveyed with a 3 m straightedge. It is signed off before any new carpet goes down, because the new surface follows whatever it is laid on.

A cleaned base meeting the edge of new carpet
A cleaned base meeting the edge of new carpet
04

Lay the new carpet

Full-length drops run the length of the cage so no joint crosses the line of play. Every joint is taped and bonded, and the lines are cut in.

How the drops sit in the Gyle Park cage
How the drops sit in the Gyle Park cage
A finished joint, barely visible once infilled
A finished joint, barely visible once infilled
05

Edges and infill

The carpet is trimmed tight to the timber kick boards and fixed to the base. Infill goes in thin passes and is brushed in until the surface is even.

The timber kick boards the new carpet finishes against
The timber kick boards the new carpet finishes against
A finished edge, with the shockpad shown under the carpet (Option C)
A finished edge, with the shockpad shown under the carpet (Option C)

How the work runs

WhenWhat happensWho
BeforeCouncil consent in place, site visit to confirm measurements, access and base, carpet orderedAIM + Play Co
Day 1Heras, signage and welfare set up, ground protection down, lifting startsAIM
Day 2Old carpet lifted and loaded out, base sweptAIM
Day 3Base cleaned, treated and surveyed. Base signed off before any carpet goes downAIM + installer
Day 4Base repairs and curing, only if the survey finds anyAIM
Days 5-6New carpet rolled out, joints taped and bonded, lines cut in, edges fixedSurfacing team
Day 7Infill spread and brushed in, in thin passesSurfacing team
Day 8Final grooming, checks, site cleared and handoverAIM + surfacing team

Before we start

What we need from you
RFI-001 · Locked or open
Will the cage be locked and maintained by Play Co, or stay open to the public? It decides which surface we recommend.
RFI-002 · Landowner consent
Gyle Park is City of Edinburgh Council land. We need the council's written consent for the works, and a copy of any lease or licence Play Co holds, before we start.
RFI-003 · Access
Is there a gate into the cage at least 1.5 m wide, or a panel the council will let us take out and refit? Our small excavator needs it.
RFI-004 · Timber boards
Are any kick boards already loose, broken or soft at the bottom? It helps us price that work before the carpet comes up.
RFI-005 · Who places the order
Please confirm the organisation and contact placing the order, and whether a constituted club or community company will apply for funding.
Technical queries
TQ-001 · Site visit
We would like a short visit to measure up, check the access and look at the base at one corner.
This quotation is built from your photos and aerial measurements. The visit lets us firm it up.
TQ-002 · Line layout
Which line markings do you want: five-a-side only, or a different small-sided layout?
The price allows for a five-a-side layout with a centre line, centre circle and two areas.

Helping to fund it

FundWhat it paysTiming
National Lottery Awards for All Scotland
For constituted groups, clubs, charities and community interest companies. Needs a lease of at least 5 years, or a letter promising one, and the landowner's permission.
Up to £10,000 for sportOpen all year, about 12 weeks to a decision
Scottish FA Pitching In
For grassroots clubs. Replacing pitch surfaces is in scope. Submit the expression of interest form now to be considered for the next round.
Not published, ask the Scottish FA2026/27 round closed, next round 2027/28
City of Edinburgh Council Community Grants Fund
Does not fund repairs, so suits a separate item such as new goals or lighting rather than the surface.
Up to £5,000Closes 31/10/2026
Aldi Scottish Sport Fund
Equipment and kit for community sports organisations.
Up to £3,000Closes 25/10/2026

Every fund here needs a constituted not-for-profit applicant, such as a club or community interest company, and written permission from the council as landowner. Funders expect the application to be written by your own organisation: we provide this quotation and any technical detail you need. No work can be ordered or started before an award is made.